This page lists corrections to published Workjigs tools: a wrong formula, value, clause or translation. Small wording and layout fixes are not listed one by one.
How tools are published
Since 20 October 2026 a tool is published only after it meets a written completion standard: published worked examples reproduced by automatic tests, the exported PDF and spreadsheet checked against the screen, phone and desktop layouts checked, and every language reviewed by a second reviewer. Tools that did not yet meet it were taken offline on that date and are being republished one at a time.
How to report an error
Use the Report a problem button at the bottom of any page or the contact page. Tell us the values you entered and the clause or document that gives the correct result.
Corrections
| Date | Tool | What changed |
|---|---|---|
| 2026-10-20 | Voltage drop and cable size | The built-in voltage-drop limits for the Japanese 内線規程 were taken from a manufacturer's page rather than the standard itself. They were removed: enter the limit from your copy of the standard, and the report shows the clause number. |
| 2026-10-20 | Voltage drop and cable size | Number formatting for some languages changed clause numbers such as 647.4(D) as if they were decimals. Clause numbers are now left as written. |
| 2026-10-20 | Site and massing check | In 6 languages, "2 storeys and 8 m or less" had been translated as a building of exactly 2 storeys. Corrected in all of them. |