Workjigs
Language: English
Tools

Architecture and construction

  1. Site and massing check: zoning limits, mass and shadows

    Check what can be built on a site: coverage, floor area ratio, setbacks and slant planes from Korean or Japanese statutes or your own rules, the largest mass floor by floor, parking, landscaping, area programme and winter shadow hours.

  2. Conceptual cost estimate by building elements

    Estimate building cost before drawings exist: footprint, storeys and heights give element quantities by UNIFORMAT II, you enter rates and markups, compare options and export a live Excel cost plan.

  3. Door, window and finish schedules from IFC or by hand

    Make door, window, room finish, room area, wall type and hardware schedules from an IFC model or by typing, with Korean, Japanese or US columns, automatic marks, a check of empty and placeholder values, revision compare and XLSX, PDF and DXF files.

  4. PDF takeoff and estimate

    Measure lengths, areas and counts on PDF drawing sets in your browser, with scale detection, snapping to drawing lines, assemblies and an Excel bill with live formulas.

  5. IFC quantity takeoff to bill of quantities

    Open an IFC model in your browser, total volumes, areas, lengths and counts by element type and material, add unit prices and export a bill of quantities to Excel.

  6. Construction schedule with critical path and S-curve

    Build a construction schedule in your browser: critical path with calendars, four link types and lags, baselines, progress and S-curve, DCMA check, look-ahead, and MS Project XML and Primavera P6 XER files.

  7. Site diary and daily report with to-date totals and schedule progress

    Keep the daily site report in the browser: weather, work by schedule activity, workers, equipment and materials with previous, today and to-date totals, photos with capture time, signatures, and progress back to the schedule as JSON, MS Project XML or Primavera XER.