Workjigs
Language: English
Tools / Logistics and packing

Container load plan: how many cartons fit, 3D plan, packing list and chargeable weight

Paste the item list from your spreadsheet, choose the container or truck, and see how many units you need, what goes where, what did not fit and why, then send the load plan and the packing list.

What the tool does

Most "how many cartons fit" answers divide volumes and promise more than goes in. The tool places every carton in the inside space of the equipment, keeps the clearance you set, and shows the result.

How to use it

  1. Choose the equipment and set the clearances you need.
  2. Paste the items (description, length, width, height, weight, cartons) or enter them, and set turning, stacking and stops.
  3. Read the load plan and the list of what did not fit; change the equipment or quantities.
  4. Fill in marks, HS codes and pieces for the packing list.
  5. Export the load plan PDF, the workbook or the 3D view.

How it was checked

Before every release the engine is run on cases with known answers: a 351 × 241 × 211 mm carton in a 20' container gives 16 × 9 × 11 = 1 584 in one orientation, as worked out in a public discussion, and the plan must reach at least that and stay below the volume ratio; no two boxes may overlap or leave the inside space; items marked upright, non-stackable or floor only must keep their rule; a payload of 28 130 kg must open a second container; the stop order must put the first stop at the door; and the volumetric divisors must give the expected weights.

Limits

The plan does not compute lashing, axle loads or the legal weight on the road, and loading in walls can leave more empty space than a skilled crew with mixed sizes. Pallets built first and then loaded, cylinders and air ULDs are not covered yet. Check the plan on the dock.

Last checked 2026-10-20